DIN Standard Gear Rack Mod. 2.5

Item Description

XIHU (WEST LAKE) DIS.HUA ChainCZPT is the most expert manufacturer ofCZPT transmission inCZPT, production roller chains, market sprockets, motorbike sprockets, casting sprockets, diverse variety of couplings, pulleys, taper bushes, locking gadgets, gears, shafts, CNC precision components and so on. We have passed ISO9001, ISO14001, TS16949 such quality and enviroment certification.

Rack and gear matched together
Mould ( M0.five — M8)
Size: 250mmr to 3000mm
Regular and particular rack
C45 metal/40Cr metal
Znic painting

Be aware:
1)Tolerance on one pitch +/-20μ M
2)Tolerance on sum of pitches +/-30μ M on 500 mm
three)The good quality grade of the toothing is from eight to nine at DIN 3962/63/sixty seven
4)Straight toothing

Product name  DIN Normal Equipment Rack Mod.2.five
Materials Available 1. Stainless Steel: SS201, SS303, SS304, SS316, SS416, SS420
2. Steel:C45(K1045), C46(K1046),C20
three. Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58), C27200(CuZn37), C28000(CuZn40)
4. Bronze: C51000, C52100, C54400, etc
five. Iron: 1213, 12L14,1215
six. Aluminum: Al6061, Al6063
7.OEM according to your request
Floor Therapy Annealing, natural anodization, heat treatment,  polishing, nickel plating, chrome plating, znic plating,yellow passivation, gold passivation,  satin, Black surface area painted and so forth.
Products Available sprockt chains, pulley, shafts(axles, spline shafts, dart shafts),gears (pinions, wheels gear rack) bearing, bearing seat,  bushing, coupling, lock assembly and so forth.
Processing Method CNC machining, punch,turning, milling, drilling, grinding, broaching, welding and assembly
QC : Technicians self-check in production,last-check out just before deal by  professional High quality inspector
Measurement Drawings
Bundle Picket Situation/Container and pallet, or as per customized specifications
Certificate ISO9001:2008 , ISO14001:2001,ISO/TS 16949:2009
Edge Quality initial Support exceptional ,CZPTd tools,Experienced staff,Excellent screening equipment
Lead Time fifteen-25days samples. 30-45days offcial order